skip to main
|
skip to sidebar
Fels.Home
Share with us the daily progress of building an adition
Wednesday, June 30, 2010
fireplace
The beginnings of the fireplace.
Monday, June 28, 2010
new stairs
More progress today. They finished framing for the AC system, the door that connects the basement to the studio and the stairs.
Saturday, June 26, 2010
AC & Heating
The AC & Heating has started and hopefully they will be done tomorrow, so we can have wall inspection by Tuesday or Wednesday.
Old sliding door to the backyard.
This area will become the new hallway, it was our dining room.
Goodbye to all my painting and stenciling :(
Friday, June 25, 2010
Kitchen elevation
The kitchen will look somewhat like this drawing.
Fireplace elevation
Electric floor plan
This is the electric floor plan for the great room and the upper and lower decks.
New opening from house to studio
I took a lot of work to break from the old house to the new studio space.
Thursday, June 24, 2010
Outside View
Three photos showing the view from the outside.
I am falling more in love with this house. Can't wait to have a party.
The new siding looks great. We will paint it white to match the old house.
These two windows are design to let in light not the view.
French Doors
With the installation of the basement french doors, the addition is finally sealed.
Old windows
View of the old bathroom window.
The two old windows facing the backyard are now closed!
Powder Room
They broke into the old house to build the powder room and a kitchen pantry.
Sliding door installed
Two large windows and a 12 foot sliding door.
With the windows installed, the room feels more like a "real room".
windows installed
These are the kitchen windows. One of them is right at countertop height, the other is on top of the cabinets.
windows installed
These are the new Andersen windows next to the fireplace.
They are very large and only 18 inches from the floor.
Friday, June 11, 2010
Fireplace
The fireplace is framed.
I changed my mind on the fireplace. I found a better, larger, more powerful fireplace.
I decide to go with the 52" instead of the 42".
The old insulation
This is the insulation we found on the other side of the 1949 bathroom.
Electrical
The electrical is almost done.
Window Wells
Three window wells outside of my studio are done. JD made them out of 6x6 wood. It looks very nice.
Newer Posts
Older Posts
Home
Subscribe to:
Comments (Atom)
Followers
Blog Archive
▼
2010
(101)
►
March
(16)
►
April
(13)
►
May
(13)
▼
June
(20)
Window Wells
Electrical
The old insulation
Fireplace
windows installed
windows installed
Sliding door installed
Powder Room
Old windows
French Doors
The new siding looks great. We will paint it white...
Outside View
New opening from house to studio
Electric floor plan
Fireplace elevation
Kitchen elevation
Old sliding door to the backyard.
AC & Heating
new stairs
fireplace
►
July
(17)
►
August
(17)
►
September
(2)
►
October
(1)
►
November
(2)
About Me
Jet
View my complete profile