Friday April 2nd
-They added a second layer of waterproofing to the basement walls, they did not have to do this, but our contractor wanted to make sure our basement stays dry. He also decided to water proof the bottom track where the drain tiles would sit.
-The added a plastic layer on top of the waterproofed wall.
-They poured the concrete on the footings for the new supporting wall.

Saturday April 3rd
-They install all the drain tiles.
-They poured all the pebbles on top of the drain tiles and added a filter on top of that.
-They made a whole for the sum-pump.