
-We decided to add insulation to the basement floor.
-Today they leveled the floor and added gravel.
-They framed the stairs.
-They connected the stair drain to the sum-pump.
-The red circles are where the rebars are.
Share with us the daily progress of building an adition
No comments:
Post a Comment